Standard Work Combination

Manual, machine and walk time for one operator through one cycle, laid against takt. Walk time is the line item nobody records and everybody pays for.

XLSX templatePDF template Entries stay in this browser

Time the job at the process, ten cycles, and use the lowest repeatable time — not the average and not the best ever.

Manual is hands-on time. Auto is the machine running unattended, which does not add to the operator's cycle. Walk is the steps between elements: count it, then design it out.


Takt time—sec / pc
Operator cycle—manual + walk
Walk time—sec, and its share
Machine time—sec, unattended

Work elements

In the order the operator does them
#Work element Manual (s)Auto (s)Walk (s) ElementCumulative% takt Waste observed
Cycle total0.00.0 0.00.0—

Element time against takt

Working on something harder than a worksheet?

Tools do not fix processes. People with a method do.

I am David Fowles. I have spent 25 years in nuclear operations, power generation field service, manufacturing quality and supply chain, and I build the capability to keep an improvement after I leave. If one of these sheets has shown you something you would rather not solve alone, say so.

Email me See what I do